Construction consisted of approximately 17,000 square foot tenant finish for Ron Jones Garage. The space was divided into a front office area complete with break room, bathrooms and a final
assembly area along with a showroom consisting of two overhead glass garage doors leading to the parking lot. The rear of the building consisted of auto body shop area, a detail bay and a large open mechanics space.
The west side of the rear tenant space housed a paint booth with underground ventilation system that was constructed and poured with concrete during the foundation phase of the building. The entire shop area included under floor drainage system that was taken to a sand and oil separator that was installed during the civil phase of construction.
The entire rear shop area floor was sealed with an acrylic product to withstand high traffic and chemical spills. The front area floors including offices, show room and final assembly was finished with an industrial epoxy coating in a metallic swirl finish.